Apply Material Constraints is a schedule option that is set in Schedule Options and can be changed for each schedule run. If selected, material constraints will be applied to the schedule run as set in the Schedule options. If not selected, material constraints will not be applied to the schedule run.
To run a schedule with material constraints, the schedule options for material constraints must be setup on in Schedule Options.
Also see Scheduling Material Constraints