Org Total Runtime
Previous Topic  Next Topic 

The Original Total Runtime (Org Total Runtime) is set when you first save an operation and is based on the org setup time and the original runtime.  If the Original Runtime is 0 when you save an operation, the original total runtime is calculated using the original setup time, the original runtime time and the quantity to build.  You can edit the Original Runtime by including this field in the operations grid using Operation Grid Selections