The Multi Shift Pools status can optionally be displayed in a column identified by a symbol in an operations grid as follows:
Indicates that the operation is a multi shift pool.
Indicates that the operation is booked with the multi shift operations.
A blank symbol means that the operation is not a multi shift pool or a booked operation with the multi shift pool operations.