To access Terms and Settings, from the DMS Monthly Calendar Menu select Options | Terms & Settings. The terms and settings screen will appear, listing all the system terms, the user terms (if there are any), and where (or not) the field is hidden. The example below shows the Terms & Settings windows:
The following is a complete list of the DMS terms:
1.Actual Method
2.Assembly
3.Baseline
4.BOM Link
5.Due Date
6.Employee Name
7.Employee Number
8.Feeds Order
9.Floor Stock
10.Head Count
11.Inv Abbrev
12.Item No
13.Job Identification
14.Job Multi Template
15.Job Notes
16.Job State
17.Job User Fields
18.Labor
19.Material
20.Material Expected Date
21.Material Firm Date
22.Material Notes
23.Material Ordered Date
24.Material Planner
25.Material PO Number
26.Material Received Date
27.Move Time
28.Op. Description
29.Op. Qty Multiplier
30.Operation User Fields
31.Order Date
32.Order Number
33.Part Number
34.Planner
35.Priority
36.Promise Date
37.Qty Available
38.Release Date
39.Resource
40.Runtime
41.Runtime Method
42.Schedule Method
43.Scrap Factor
44.Security Certificate
45.Sequence Type
46.Setup
47.Type of Job
48.Type of Work
49.Wait Time
50.Work performed by
The following tabs and commands are available:
File
1.Edit To edit a term, highlight the term in the grid and select File | Edit or double click on user term to change in the grid.
Depending on the term selected, the options are different. For example, some terms, such as Job Identification, can be hidden, while other terms, such as Due Date, cannot be hidden and must be entered. Those prompts that do not apply to the selected term either do not appear or are disabled (grayed out).
The following explains all the available options for Terms and Settings when Edit is selected:
1.System term The system term for the selected item to edit is displayed. It cannot be changed.
2.User term You have the option of entering your own term that will replace the system term in DMS. If you leave this field blank, the system term will be used. Anything else that is entered becomes the new term that is used throughout DMS.
3.Short User Term The short user term is a 5 character long, shortened term that may be used on displays or reports where there is limited room for the full length term.
4.Mask A mask is an optional entry for some terms. (See Masked Input for more detail.) Order Number, Part Number, and Job Identification can have masks.
5.Round qty up This prompt appears for the Quantity Multiplier term only. If selected DMS will round quantities that use the quantity multiplier up to the next highest whole number.
6.Show Shifts If the term selected has an option to display a shift, select this check box if you want the shift to be displayed. Otherwise, leave this checkbox unselected. Baseline dates, Due Date, and Release Date have an option to use shifts with these dates.
7.Hide Field Select this checkbox if you do not want to hide the term and the features that go with it. For example, if you do not use Assembly jobs, you can hide Assembly and the Assembly tab will not appear in Manufacturing Order. Certain fields, such as Due Date, cannot be hidden as they are required by DMS.
8.Input Required Job Identification, Part Number, Planner, and Material Planner can be identified as requiring input. That is, you cannot leave these fields blank if this option is selected.
9.Default Entry Certain terms have the option of a default entry when used in DMS. For example, you can default Job State to a defined job state (such as "Schedule") whenever you create a new job. Depending on the term selected, the corresponding defaults will appear if the term has a default entry. Terms with defaults are:
1.Job State can default to a defined job state.
2.Priority can have a default priority and a priority range from 1 up to 99.
3.Runtime Method can be set to a default runtime method of either time/piece, parts/hour, or hours.
4.Schedule Method can be set to a default schedule method.
5.Sequence Types can be set to a default sequence type.
6.Type of Job can be set to a default type of job of either Production or Fabrication.
7.Type of Work can be set to a default type of work.
Click Save to save the term settings you have entered, or click Cancel to ignore the changes made.
Order Number has an option to generate automatic order numbers. The example below shows the Order Number window:
If you want DMS to generate order numbers automatically in Manufacturing Order (job details), enter the following information:
1.Auto generate order number Select this checkbox to have DMS automatically generate order numbers.
2.Start/current number This prompt will display the current order number. If 0, order numbers have not been generated. Enter the starting order number.
3.Number of digits Enter the number of digits of the order numbers to be generated. For example, to have an 8 digit order number, enter 8.
4.String prefix If you want a string prefix, enter the prefix to this prompt.
The example below shows the settings to automatically generate order numbers in Manufacturing Order, where the start number will be 100, the number of digits will be 7, and a prefix of MO- will be used:
The above settings will generate the following order numbers:
MO-1000100
MO-1000101
MO-1000102
etc.
There are three terms that have different settings that automatically appear when selected. They are:
1.Op Qty Multiplier The operation quantity multiplier term has an option of rounding the quantity to the next highest whole number rather then the next lowest whole number. That is, if the quantity multiplier creates a quantity to build that is a fraction, selecting this option means that DMS will round the fractional quantity to build up to the next highest whole number. If the option is not selected, DMS will round the quantity to build down to the next lowest whole number. For example, suppose you have a quantity to build of 5 and the quantity multiplier is .3. DMS will calculate the quantity to build as .3 x 5 to get 1.5. If the Round qty up is selected, DMS will round 1.5 up to 2 as the quantity to build. If it is not selected, DMS will round the quantity down to 1.
2.Setup Setup has an option of selecting the number of decimal places for fraction of hours. The default is 2 decimal places (as in 1.25 hours). You can change the decimal place and set them from 0 up to 5 decimal places.
3.Runtime Runtime has an option of selecting the number of decimal places for fraction of hours. The default is 2 decimal places (as in 1.25 hours). You can change the decimal place and set them from 0 up to 5 decimal places.